Project Overview
The Palm House is an iconic Victorian glasshouse and indoor rainforest within the world-renowned Royal Botanic Gardens, Kew.
Its high-traffic heritage setting required durable pathways that complemented the natural landscape.
The Challenge
Designers required a surface that was durable, long-lasting, and visually sympathetic to the
surroundings, avoiding the harshness of traditional black asphalt while coping with high footfall.
The Solution
NatraTex Cotswold was selected to create pathways that combine the strength of asphalt with the
appearance of natural stone. Approximately 500m² of surfacing was installed, delivering a robust,
low-maintenance finish suitable for both pedestrian and light vehicular use.
Key Benefits
- Sympathetic natural stone appearance
- Durable and long-lasting performance
- Low maintenance
- Cost-effective alternative to other decorative surfaces
- Quick and efficient installation
Outcome
The completed pathways deliver a high-quality finish that enhances the visitor experience while
standing up to heavy usage. The result is a natural-looking, durable surface suitable for one of the
UK’s most iconic heritage sites.
Commenting on the project, Ian Marshall of sub-contractors Marshall Surfacing said,
“Having worked with Bituchem on a number of projects we have always been very impressed. We understood that a project of such prestige would need an attractive yet hardwearing solution. Natratex fitted the bill perfectly and is also more economical than other products.”